{"id":25804,"date":"2025-08-06T12:00:55","date_gmt":"2025-08-06T10:00:55","guid":{"rendered":"https:\/\/actiaenergy.com\/uncategorized\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/"},"modified":"2025-08-06T12:00:55","modified_gmt":"2025-08-06T10:00:55","slug":"pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion","status":"publish","type":"post","link":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/","title":{"rendered":"PAS9035 Controlled Substation: Modernization of the EDF SEI Network in La R\u00e9union"},"content":{"rendered":"<p>ACTIA Energy continues the deployment of its PAS9035 &#8211; Satellite Controlled Substation, with a fifteenth successful commissioning on La R\u00e9union Island for <a href=\"https:\/\/reunion.edf.fr\/edf-a-la-reunion\/nos-installations-a-la-reunion\/les-reseaux-electriques-a-la-reunion\" target=\"_blank\" rel=\"noopener\">EDF SEI Insular Energy Systems<\/a>, in collaboration with <a href=\"https:\/\/www.omexom.fr\/expertises\/\" target=\"_blank\" rel=\"noopener\">OMEXOM<\/a>. This new stage is part of an electrical infrastructure modernization program that began in 2015, with the aim of strengthening the reliability of La R\u00e9union&#8217;s island network. <\/p>\n<p>The PAS9035 is a high-capacity RTU (Remote Terminal Unit), capable of controlling over 1000 wired data points in a single 6U rack. It integrates perfectly with the control system used by EDF SEI, using redundant IEC 101 and IEC 104 protocols, thus ensuring compatibility with current remote supervision and control standards. For more modest infrastructures, system configuration and deployment can be carried out using the <a href=\"https:\/\/actiaenergy.com\/solutions\/calculateur-interface-poste-9035\/\">Substation Interface Calculator (CIP9035)<\/a> solution.  <\/p>\n<h2>A Key Device for Island Networks<\/h2>\n<p>La R\u00e9union&#8217;s electrical grid, isolated from the mainland, imposes specific requirements: it must operate autonomously while integrating multiple production sources. Unlike mainland networks, substations must manage both EHV and HV, and be able to control their various production means: <\/p>\n<ul>\n<li>TAC units &#8211; fuel oil,<\/li>\n<li>Hydroelectric power plants,<\/li>\n<li>Storage batteries.<\/li>\n<\/ul>\n<p>The PAS9035 addresses these constraints by offering advanced flexibility, enabling optimized management of available local resources.<\/p>\n<p>With its 6U format, it can control several hundred wired signals and integrates perfectly with EDF SEI&#8217;s GE network remote control system, thanks to the redundant IEC 104 protocol. It thus contributes to network flexibility, optimization of local resources, and a gradual transition towards a digital network. <\/p>\n<h2>A Long-Term Modernization Program<\/h2>\n<p>Since 2015, ACTIA Energy has been gradually replacing ALSTOM&#8217;s old PA S900s with PAS9035s on the island. One to two installations are carried out each year, with a focus on operational continuity and budgetary control. This deployment, initiated 10 years ago, strengthens the reliability of La R\u00e9union&#8217;s network and illustrates ACTIA Energy&#8217;s commitment to modernizing island electrical infrastructures.  <\/p>\n<h2>Successful Commissioning Thanks to Strong Collaboration<\/h2>\n<p>The success of this fifteenth commissioning of the PAS9035 in La R\u00e9union is primarily based on the quality of collaboration between the various project stakeholders. In an island context, each intervention requires rigorous coordination, mastery of local constraints, and a thorough understanding of the territory&#8217;s technical and energy challenges. <\/p>\n<p>This success illustrates the complementarity of the expertise mobilized on site. ACTIA Energy has contributed its recognized expertise in the design, integration, and commissioning of advanced remote control solutions, adapted to the specificities of La R\u00e9union&#8217;s network. Thanks to nearly 10 years of experience on the island, ACTIA Energy masters not only the deployed technologies but also the operational aspects for an island territory.  <\/p>\n<p>The gradual migration phase, carried out over two weeks, was conducted with method and expertise, while keeping the sections in operation. This crucial step was made possible by the close coordination between ACTIA Energy&#8217;s teams, EDF SEI La R\u00e9union&#8217;s technicians, and the on-site presence of OMEXOM, a long-standing partner in this deployment. <\/p>\n<p>Everyone contributed to the success of the operation, in compliance with safety, quality, and service continuity requirements.<\/p>\n<div class=\"alert alert-dark\">\n<p><img decoding=\"async\" loading=\"lazy\" width=\"233\" height=\"200\" src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/illustration-actualite-right-w700h600\" class=\"alignright wp-image-10909 hidden-phone\" alt=\"ACTIA Energy, News\"><\/p>\n<h3 class=\"alert-heading\"><i class=\"fa-solid fa-circle-info\"><\/i>Also Consult!<\/h3>\n<hr>\n<p class=\"mb-0\"><i class=\"fa-solid fa-caret-right\"><\/i>Find the <a href=\"https:\/\/fr.linkedin.com\/posts\/actia-energy_pas9035-omexom-edfsei-activity-7353725570502852610-N2Se\" target=\"_blank\" rel=\"noopener\" role=\"link\">LinkedIn post<\/a> published by ACTIA Energy.<\/p>\n<\/div>\n<div  id=\"jtg-15997\" class=\"modula modula-gallery modula-columns\" data-config=\"{&quot;tabletHeight&quot;:800,&quot;mobileHeight&quot;:800,&quot;desktopHeight&quot;:800,&quot;enableTwitter&quot;:false,&quot;enableWhatsapp&quot;:false,&quot;enableFacebook&quot;:false,&quot;enablePinterest&quot;:false,&quot;enableLinkedin&quot;:false,&quot;enableEmail&quot;:false,&quot;randomFactor&quot;:0.5,&quot;type&quot;:&quot;grid&quot;,&quot;columns&quot;:12,&quot;gutter&quot;:10,&quot;mobileGutter&quot;:10,&quot;tabletGutter&quot;:10,&quot;desktopGutter&quot;:10,&quot;enableResponsive&quot;:true,&quot;tabletColumns&quot;:2,&quot;mobileColumns&quot;:2,&quot;lazyLoad&quot;:0,&quot;lightboxOpts&quot;:{&quot;animated&quot;:true,&quot;Thumbs&quot;:{&quot;type&quot;:&quot;modern&quot;,&quot;showOnStart&quot;:false},&quot;Toolbar&quot;:{&quot;display&quot;:{&quot;right&quot;:[&quot;close&quot;]},&quot;enabled&quot;:true},&quot;Carousel&quot;:{&quot;Panzoom&quot;:{&quot;touch&quot;:true},&quot;infinite&quot;:false},&quot;keyboard&quot;:{&quot;Escape&quot;:&quot;close&quot;,&quot;Delete&quot;:&quot;close&quot;,&quot;Backspace&quot;:&quot;close&quot;,&quot;PageUp&quot;:false,&quot;PageDown&quot;:false,&quot;ArrowUp&quot;:false,&quot;ArrowDown&quot;:false,&quot;ArrowRight&quot;:false,&quot;ArrowLeft&quot;:false},&quot;touch&quot;:false,&quot;backdropClick&quot;:false,&quot;l10n&quot;:{&quot;CLOSE&quot;:&quot;Close&quot;,&quot;NEXT&quot;:&quot;Next&quot;,&quot;PREV&quot;:&quot;Previous&quot;,&quot;Error&quot;:&quot;The requested content cannot be loaded. Please try again later.&quot;,&quot;PLAY_START&quot;:&quot;Start slideshow&quot;,&quot;PLAY_STOP&quot;:&quot;Pause slideshow&quot;,&quot;FULL_SCREEN&quot;:&quot;Full screen&quot;,&quot;THUMBS&quot;:&quot;Thumbnails&quot;,&quot;DOWNLOAD&quot;:&quot;Download&quot;,&quot;SHARE&quot;:&quot;Share&quot;,&quot;ZOOM&quot;:&quot;Zoom&quot;,&quot;EMAIL&quot;:&quot;Here is the link to the image : %%image_link%% and this is the link to the gallery : %%gallery_link%%&quot;,&quot;MODAL&quot;:&quot;You can close this modal content with the ESC key&quot;,&quot;ERROR&quot;:&quot;Something Went Wrong, Please Try Again Later&quot;,&quot;IMAGE_ERROR&quot;:&quot;Image Not Found&quot;,&quot;ELEMENT_NOT_FOUND&quot;:&quot;HTML Element Not Found&quot;,&quot;AJAX_NOT_FOUND&quot;:&quot;Error Loading AJAX : Not Found&quot;,&quot;AJAX_FORBIDDEN&quot;:&quot;Error Loading AJAX : Forbidden&quot;,&quot;IFRAME_ERROR&quot;:&quot;Error Loading Page&quot;,&quot;TOGGLE_ZOOM&quot;:&quot;Toggle zoom level&quot;,&quot;TOGGLE_THUMBS&quot;:&quot;Toggle thumbnails&quot;,&quot;TOGGLE_SLIDESHOW&quot;:&quot;Toggle slideshow&quot;,&quot;TOGGLE_FULLSCREEN&quot;:&quot;Toggle full-screen mode&quot;},&quot;Images&quot;:{&quot;Panzoom&quot;:{&quot;maxScale&quot;:2}},&quot;mainClass&quot;:&quot;modula-fancybox-container modula-lightbox-jtg-15997&quot;,&quot;Html&quot;:{&quot;videoAutoplay&quot;:0,&quot;videoTpl&quot;:&quot;&lt;video class=\\&quot;fancybox__html5video\\&quot; controls muted playsinline controlsList controlsList=\\&quot;nodownload\\&quot; poster=\\&quot;{{poster}}\\&quot; src=\\&quot;{{src}}\\&quot; type=\\&quot;{{format}}\\&quot; &gt;  Sorry, your browser doesn&#039;t support embedded videos, &lt;a href=\\&quot;{{src}}\\&quot;&gt; download &lt;\\\/a&gt; and watch with your favorite video player! &lt;\\\/video&gt;&quot;}},&quot;inView&quot;:false,&quot;email_subject&quot;:&quot;Check out this awesome image !!&quot;,&quot;email_message&quot;:&quot;Here is the link to the image : %%image_link%% and this is the link to the gallery : %%gallery_link%%&quot;,&quot;grid_type&quot;:&quot;4&quot;,&quot;rowHeight&quot;:250,&quot;lastRow&quot;:&quot;justify&quot;,&quot;lightbox&quot;:&quot;fancybox&quot;}\">\n\n\t<div class=\"modula-grid-sizer\"> <\/div>\n\t<div  class=\"modula-items grid-gallery\">\n\t\t<div class=\"modula-item effect-pufrobo\" >\n\t<div class=\"modula-item-overlay\"><\/div>\n\n\t<div class=\"modula-item-content\">\n\n\t\t<a data-image-id=\"15998\" role=\"button\" data-elementor-open-lightbox=\"no\" tabindex=\"0\" rel=\"jtg-15997\" data-caption=\"\" aria-label=\"Open image in lightbox\" class=\"tile-inner modula-item-link\"><\/a><img loading=\"lazy\" decoding=\"async\" class=\"pic wp-image-15998\"  data-valign=\"middle\" data-halign=\"center\" alt=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 1.jpg\" data-full=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1.jpg\" title=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 1.jpg\" crop=\"\" width=\"1200\" height=\"800\" src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1.jpg\" data-src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1.jpg\" data-caption=\"\" srcset=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1.jpg 1200w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1-1024x683.jpg 1024w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-01-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/>\n\t\t<div class=\"figc no-description\">\n\t\t\t<div class=\"figc-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\n\t<\/div>\n\n<\/div><div class=\"modula-item effect-pufrobo\" >\n\t<div class=\"modula-item-overlay\"><\/div>\n\n\t<div class=\"modula-item-content\">\n\n\t\t<a data-image-id=\"15999\" role=\"button\" data-elementor-open-lightbox=\"no\" tabindex=\"0\" rel=\"jtg-15997\" data-caption=\"\" aria-label=\"Open image in lightbox\" class=\"tile-inner modula-item-link\"><\/a><img loading=\"lazy\" decoding=\"async\" class=\"pic wp-image-15999\"  data-valign=\"middle\" data-halign=\"center\" alt=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 2.jpg\" data-full=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1.jpg\" title=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 2.jpg\" crop=\"\" width=\"1200\" height=\"800\" src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1.jpg\" data-src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1.jpg\" data-caption=\"\" srcset=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1.jpg 1200w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1-1024x683.jpg 1024w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-02-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/>\n\t\t<div class=\"figc no-description\">\n\t\t\t<div class=\"figc-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\n\t<\/div>\n\n<\/div><div class=\"modula-item effect-pufrobo\" >\n\t<div class=\"modula-item-overlay\"><\/div>\n\n\t<div class=\"modula-item-content\">\n\n\t\t<a data-image-id=\"16000\" role=\"button\" data-elementor-open-lightbox=\"no\" tabindex=\"0\" rel=\"jtg-15997\" data-caption=\"\" aria-label=\"Open image in lightbox\" class=\"tile-inner modula-item-link\"><\/a><img loading=\"lazy\" decoding=\"async\" class=\"pic wp-image-16000\"  data-valign=\"middle\" data-halign=\"center\" alt=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 3.jpg\" data-full=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1.jpg\" title=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 3.jpg\" crop=\"\" width=\"1200\" height=\"800\" src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1.jpg\" data-src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1.jpg\" data-caption=\"\" srcset=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1.jpg 1200w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1-1024x683.jpg 1024w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-03-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/>\n\t\t<div class=\"figc no-description\">\n\t\t\t<div class=\"figc-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\n\t<\/div>\n\n<\/div><div class=\"modula-item effect-pufrobo\" >\n\t<div class=\"modula-item-overlay\"><\/div>\n\n\t<div class=\"modula-item-content\">\n\n\t\t<a data-image-id=\"16001\" role=\"button\" data-elementor-open-lightbox=\"no\" tabindex=\"0\" rel=\"jtg-15997\" data-caption=\"\" aria-label=\"Open image in lightbox\" class=\"tile-inner modula-item-link\"><\/a><img loading=\"lazy\" decoding=\"async\" class=\"pic wp-image-16001\"  data-valign=\"middle\" data-halign=\"center\" alt=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 4.jpg\" data-full=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1.jpg\" title=\"PAS9035 Poste Asservi : modernisation du r\u00e9seau EDF SEI \u00e0 La R\u00e9union 4.jpg\" crop=\"\" width=\"1200\" height=\"800\" src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1.jpg\" data-src=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1.jpg\" data-caption=\"\" srcset=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1.jpg 1200w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1-1024x683.jpg 1024w, https:\/\/actiaenergy.com\/wp-content\/uploads\/PAS9035-Moufia-LaReunion-04-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/>\n\t\t<div class=\"figc no-description\">\n\t\t\t<div class=\"figc-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\n\t<\/div>\n\n<\/div>\t\t\n\t<\/div>\n\n\t\n\t\n\t<script type=\"application\/ld+json\">\n\t{\n\t\t\"@context\": \"https:\/\/schema.org\",\n\t\t\"@type\"   : \"ImageGallery\",\n\t\t\"id\"      : \"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#modula-gallery-15997\",\n\t\t\"url\"     : \"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/\"\n\t}\n\n\t<\/script>\n\n\t\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>ACTIA Energy continues the deployment of its PAS9035 &#8211; Satellite Controlled Substation, with a fifteenth successful commissioning on La R\u00e9union Island for EDF SEI Insular Energy Systems, in collaboration with OMEXOM. This new stage is part of an electrical infrastructure modernization program that began in 2015, with the aim of strengthening the reliability of La R\u00e9union&#8217;s island network. The PAS9035 is a high-capacity RTU (Remote Terminal Unit), capable of controlling over 1000 wired data points in a single 6U rack. It integrates perfectly with the control system used by EDF SEI, using redundant IEC 101 and IEC 104 protocols, thus ensuring compatibility with current remote supervision and control standards. For more modest infrastructures, system configuration and deployment can be carried out using the Substation Interface Calculator (CIP9035) solution. A Key Device for Island Networks La R\u00e9union&#8217;s electrical grid, isolated from the mainland, imposes specific requirements: it must operate autonomously while integrating multiple production sources. Unlike mainland networks, substations must manage both EHV and HV, and be able to control their various production means: TAC units &#8211; fuel oil, Hydroelectric power plants, Storage batteries. The PAS9035 addresses these constraints by offering advanced flexibility, enabling optimized management of available local resources. With its 6U format, it can control several hundred wired signals and integrates perfectly with EDF SEI&#8217;s GE network remote control system, thanks to the redundant IEC 104 protocol. It thus contributes to network flexibility, optimization of local resources, and a gradual transition towards a digital network. A Long-Term Modernization Program Since 2015, ACTIA Energy has been gradually replacing ALSTOM&#8217;s old PA S900s with PAS9035s on the island. One to two installations are carried out each year, with a focus on operational continuity and budgetary control. This deployment, initiated 10 years ago, strengthens the reliability of La R\u00e9union&#8217;s network and illustrates ACTIA Energy&#8217;s commitment to modernizing island electrical infrastructures. Successful Commissioning Thanks to Strong Collaboration The success of this fifteenth commissioning of the PAS9035 in La R\u00e9union is primarily based on the quality of collaboration between the various project stakeholders. In an island context, each intervention requires rigorous coordination, mastery of local constraints, and a thorough understanding of the territory&#8217;s technical and energy challenges. This success illustrates the complementarity of the expertise mobilized on site. ACTIA Energy has contributed its recognized expertise in the design, integration, and commissioning of advanced remote control solutions, adapted to the specificities of La R\u00e9union&#8217;s network. Thanks to nearly 10 years of experience on the island, ACTIA Energy masters not only the deployed technologies but also the operational aspects for an island territory. The gradual migration phase, carried out over two weeks, was conducted with method and expertise, while keeping the sections in operation. This crucial step was made possible by the close coordination between ACTIA Energy&#8217;s teams, EDF SEI La R\u00e9union&#8217;s technicians, and the on-site presence of OMEXOM, a long-standing partner in this deployment. Everyone contributed to the success of the operation, in compliance with safety, quality, and service continuity requirements. Also Consult! Find the LinkedIn post published by ACTIA Energy.<\/p>\n","protected":false},"author":6,"featured_media":25805,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[3235],"tags":[3259,3258,3261,3257,3256,3260],"class_list":["post-25804","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-edf-sei","tag-la-reunion","tag-omexom","tag-pas9035","tag-rtu","tag-smart-grid"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union<\/title>\n<meta name=\"description\" content=\"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union\" \/>\n<meta property=\"og:description\" content=\"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/\" \/>\n<meta property=\"og:site_name\" content=\"ACTIA Energy\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-06T10:00:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion-1024x320.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"320\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"ACTIA Energy\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ACTIA Energy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/\"},\"author\":{\"name\":\"ACTIA Energy\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#\\\/schema\\\/person\\\/7e76b218409cd44b4e17f6b0dafeb24f\"},\"headline\":\"PAS9035 Controlled Substation: Modernization of the EDF SEI Network in La R\u00e9union\",\"datePublished\":\"2025-08-06T10:00:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/\"},\"wordCount\":532,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png\",\"keywords\":[\"EDF SEI\",\"La R\u00e9union\",\"OMEXOM\",\"PAS9035\",\"RTU\",\"SMART GRID\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/\",\"url\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/\",\"name\":\"PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png\",\"datePublished\":\"2025-08-06T10:00:55+00:00\",\"description\":\"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png\",\"contentUrl\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png\",\"width\":1920,\"height\":600,\"caption\":\"Poste Asservi PAS9035 : 15e mise en service \u00e0 La R\u00e9union\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/news\\\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"ACTIA Energy\",\"item\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/actia-energy\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/uncategorized\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"PAS9035 Controlled Substation: Modernization of the EDF SEI Network in La R\u00e9union\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/\",\"name\":\"ACTIA Energy\",\"description\":\"L&#039;ing\u00e9nierie de l&#039;\u00e9nergie de demain.\",\"publisher\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#organization\",\"name\":\"ACTIA Energy\",\"url\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Logo-ACTIA-Couleurs-h150.png\",\"contentUrl\":\"https:\\\/\\\/actiaenergy.com\\\/wp-content\\\/uploads\\\/Logo-ACTIA-Couleurs-h150.png\",\"width\":706,\"height\":150,\"caption\":\"ACTIA Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/actiaenergy.com\\\/en\\\/#\\\/schema\\\/person\\\/7e76b218409cd44b4e17f6b0dafeb24f\",\"name\":\"ACTIA Energy\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g\",\"caption\":\"ACTIA Energy\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union","description":"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/","og_locale":"en_US","og_type":"article","og_title":"PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union","og_description":"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.","og_url":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/","og_site_name":"ACTIA Energy","article_published_time":"2025-08-06T10:00:55+00:00","og_image":[{"width":1024,"height":320,"url":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion-1024x320.png","type":"image\/png"}],"author":"ACTIA Energy","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ACTIA Energy","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#article","isPartOf":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/"},"author":{"name":"ACTIA Energy","@id":"https:\/\/actiaenergy.com\/en\/#\/schema\/person\/7e76b218409cd44b4e17f6b0dafeb24f"},"headline":"PAS9035 Controlled Substation: Modernization of the EDF SEI Network in La R\u00e9union","datePublished":"2025-08-06T10:00:55+00:00","mainEntityOfPage":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/"},"wordCount":532,"commentCount":0,"publisher":{"@id":"https:\/\/actiaenergy.com\/en\/#organization"},"image":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#primaryimage"},"thumbnailUrl":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png","keywords":["EDF SEI","La R\u00e9union","OMEXOM","PAS9035","RTU","SMART GRID"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/","url":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/","name":"PAS9035 Controlled Substation: 15th Commissioning in La R\u00e9union","isPartOf":{"@id":"https:\/\/actiaenergy.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#primaryimage"},"image":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#primaryimage"},"thumbnailUrl":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png","datePublished":"2025-08-06T10:00:55+00:00","description":"Completion of the 15th Commissioning of the PAS9035 Controlled Substation in La R\u00e9union for EDF SEI with Omexom. A step forward for the island network.","breadcrumb":{"@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#primaryimage","url":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png","contentUrl":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Poste-Asservi-PAS9035-15e-mise-en-service-a-La-Reunion.png","width":1920,"height":600,"caption":"Poste Asservi PAS9035 : 15e mise en service \u00e0 La R\u00e9union"},{"@type":"BreadcrumbList","@id":"https:\/\/actiaenergy.com\/en\/news\/pas9035-controlled-substation-modernization-of-the-edf-sei-network-in-la-reunion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"ACTIA Energy","item":"https:\/\/actiaenergy.com\/en\/actia-energy\/"},{"@type":"ListItem","position":2,"name":"Uncategorized","item":"https:\/\/actiaenergy.com\/en\/uncategorized\/"},{"@type":"ListItem","position":3,"name":"PAS9035 Controlled Substation: Modernization of the EDF SEI Network in La R\u00e9union"}]},{"@type":"WebSite","@id":"https:\/\/actiaenergy.com\/en\/#website","url":"https:\/\/actiaenergy.com\/en\/","name":"ACTIA Energy","description":"L&#039;ing\u00e9nierie de l&#039;\u00e9nergie de demain.","publisher":{"@id":"https:\/\/actiaenergy.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/actiaenergy.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/actiaenergy.com\/en\/#organization","name":"ACTIA Energy","url":"https:\/\/actiaenergy.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiaenergy.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Logo-ACTIA-Couleurs-h150.png","contentUrl":"https:\/\/actiaenergy.com\/wp-content\/uploads\/Logo-ACTIA-Couleurs-h150.png","width":706,"height":150,"caption":"ACTIA Energy"},"image":{"@id":"https:\/\/actiaenergy.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/actiaenergy.com\/en\/#\/schema\/person\/7e76b218409cd44b4e17f6b0dafeb24f","name":"ACTIA Energy","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/74a43f5a2491b706609180d3059d0b4269b25d859801497ec0d248fe75f37ac4?s=96&d=https%3A%2F%2Factiaenergy.com%2Fwp-content%2Fuploads%2Ficon-ACTIA-green-avatar-w256h256-150x150.png&r=g","caption":"ACTIA Energy"}}]}},"_links":{"self":[{"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/posts\/25804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/comments?post=25804"}],"version-history":[{"count":0,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/posts\/25804\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/media\/25805"}],"wp:attachment":[{"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/media?parent=25804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/categories?post=25804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actiaenergy.com\/en\/wp-json\/wp\/v2\/tags?post=25804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}